Agendas

9/3/26 - Regular Meeting

A reimagined version of the Tampa City Council agenda including mirrored supporting documents.

This is a reimagined version of the Tampa City Council agenda. It removes legalese from the descriptions, parses Background details from the Summary Sheet when available, and links to supporting documents. Document links point to our mirrored copies for long-term stability. For original documents, refer to the official final agenda from the clerk in Onbase.

City Clerk's Final Agenda in Onbase

Community Sponsor

What's changed

Agenda was finalized.

New documents:

Commendations And/or Presentations

1 File No. E2026-15

Presentation of Commendation to the Police Officer of the Month.

2 File No. E2026-15

Presentation of Commendation to the Firefighter of the Quarter.

3 File No. CM26-26795

Mayor’s Hispanic Heritage Committee to present a brief invitation to Council for the annual Hispanic Heritage Celebration.

Board and Administration Appointments

6 File No. BA26-26432

Resolution approving the appointment by the Mayor of Yasmeen Neuman, to the Code Enforcement Board/Public Nuisance Abatement Board (Board) for a three year term commencing on September 3, 2026 and ending September 2, 2029.

Item details

Background

The Mayor appointed Yasmeen Neuman to serve as a member of the Board from City Council District 7, for a three year term commencing September 3, 2026 and ending September 2, 2029 or until a qualified successor is selected. The Mayor has requested the approval of the appointment by City Council as required by Chapter 9 of the City of Tampa Code.

7 File No. BA26-26842

(3-minute presentation per applicant) Presentation of applicants expressing an interest in being appointed to a board member position on the Civil Service Board. Shirley Foxx-Knowles, City Clerk, transmitting five (5) applications, expressing an interest in being considered for appointment to the Civil Service Board.

Neighborhood and Community Affairs Committee

8 File No. NCA26-26242

Resolution approving the renewal of an agreement between the City of Tampa and MyDatt Services, Inc. dba Block By Block, without a price increase, for the provision of YBOR City Community Ambassadors and Environmental Clean Team in the estimated amount of $1,016,091 for use by the YBOR Community Redevelopment Area.

Item details

Financial impact

This resolution renews the Agreement between the City and MyDatt Services, Inc. dba Block by Block for the provision of Ybor City Community Ambassadors and Environmental Clean Team and provides an amount not to exceed $1,016,091 over a 12-month term, subject to annual appropriation, for use by the Ybor Community Redevelopment Area within the General, Ybor I and Ybor II CRA Funds.

Spending authorized (FY27)
$1,016,091
Funding sources
  • $34,149General FundCRA AdministrationOther ServicesFY27 · 01100.213801.534000Estimated Expenditure
  • $775,781Community Redevelopment Agency (CRA) - YborCRA Contract ServicesOther-Professional ServicesFY27 · 62600.213802.531002Estimated Expenditure
  • $206,161Community Redevelopment Agency (CRA) - Ybor IICRA Contract ServicesOther-Professional ServicesFY27 · 62700.213802.531002Estimated Expenditure

Background

It is recommended that the City renew its existing award with MyDatt Services, Inc. dba Block by Block for the provision of Ybor City Community Ambassadors and Environmental Clean Team for use by the Community Redevelopment Agency Department for an additional one-year term. The existing award was made August 2022. This award is in its first renewal term.

MyDatt Services, Inc. dba Block by Block provides excellent service, quality of product, and performance. The Community Redevelopment Agency Department has reviewed the prices and feels that it is in the best interest of the City to renew the award for an additional one-year period. MyDatt Services, Inc. dba Block by Block has agreed to renew Ybor City Community Ambassadors and Environmental Clean Team without a price escalation.

Equal Business Opportunity: This award was made through the Request for Proposal. Goals were not prescribed in this work order; however, it did not preclude participation.

This award was made through the Request for Proposal process. Proposers are eligible to earn up to 20 points (out of a possible 100) for EBO participation.

9 File No. NCA26-26428

Resolution approving a license And Hold Harmless Agreement between the City of Tampa, Florida and Jesuit High School of Tampa, Inc. to use certain areas of Al Lopez Park to park vehicles during Jesuit High School football games based on a Five Hundred and Twenty-Five Dollar ($525) per game use rate.

Item details

Financial impact

This resolution approves and agreement between the City of Tampa and Jesuit High School of Tampa Inc. for parking at Al Lopez Park during football games in the amount of $525. Revenue will be based on usage and will be received by the Parks and Recreation Department within the General Fund.

Grant or revenue accepted
$525
Funding sources
  • $525General FundParks and Recreation BudgetParks-Special Events01100.225700.347404revenue

Background

Jesuit High School (Licensee) desires to use a portion of City owned property located at 4810 N. Himes Ave., Tampa Florida 33614, Al Lopez Park (Premises), as more particularly depicted in Exhibit "A", attached hereto and incorporated herein, to occupy certain areas of the park for parking vehicles during Jesuit High School football games; and in consideration of the Licensee use and access to the Premises, a fee shall be paid by the Licensee upon receipt of a monthly invoice from the City based on a fee of Five hundred and Twenty-Five Dollars ($525) per scheduled games; as provided for in Exhibit "D"; and Licensee, by executing this Agreement, assumes all risk , wether known or unkown, which may arise from such activities provided for in Section 3 of the Agreement; and City is willing to license said property to licensee under the terms and conditions enumerated herein.

10 File No. NCA26-26433

(Part 1 of 2)(See Item ) Resolution approving a Design-Build Services Agreement with a Guaranteed Maximum Price (GMP-1) for Contract 22-C-00010-GMP01 Rivercrest Park Boardwalk Replacement Design-Build between the City of Tampa and Midcoast Construction Enterprises LLC, in the amount of $1,090,100.

Item details

Financial impact

This Resolution provides funding in the total amount of $1,090,100 for design-build services for the Rivercrest Boardwalk Renovation project. Funding will be provided from within the CIT Series 2020 Bonds Capital Projects Fund in the amount of $847,000, CIT Program 5 Capital Projects Fund in the amount of $75,000, CIT Program 6 Capital Projects Fund in the amount of $100,000, and Utilities Services Tax Capital Projects Fund in the amount of $68,100.

Spending authorized
$1,090,100
Funding sources
  • $847,000CIT Series 2020 Bonds Capital Projects FundParks Capital Project ManagementImprov Other Than BldgsRivercrest Pk Boardwalk Renov30260.225800.563001.1001936Expenditure
  • $75,000CIT Program 5 FY17 - FY21 Capital ProjectsParks Capital Project ManagementInfrastructureRivercrest Pk Boardwalk Renov30210.225800.563000.1001936Expenditure
  • $100,000CIT Program 6 FY22 - FY26 Capital ProjectsParks Capital Project ManagementInfrastructureRivercrest Pk Boardwalk Renov30211.225800.563000.1001936Expenditure
  • $68,100Utilities Services Tax Capital Projects - Pay GoParks Capital Project ManagementInfrastructureRivercrest Pk Boardwalk Renov31400.225800.563000.1001936Expenditure

Background

  1. Contract Title: 22-C-00010 Rivercrest Park Boardwalk Replacement Design-Build a. Address of Project: 4802 North Boulevard, Tampa, FL, 33603 b. Number of bidders/submitters: 3 (three) c. Names of bidders/submitters: • Midcoast Construction Enterprises LLC • Tampa Contracting Services, Inc.
  2. Contractor/Firm: Midcoast Construction Enterprises, LLC
  3. Business Case: • This project provides for the Design-Build services related to the design and construction of a multi-use dock, boardwalk, and seawall system repair and/or replacement at Rivercrest Park, as well as improvements and repairs to the adjacent trail and all associated work required for a complete project in accordance with the contract.
  4. Equal Business Opportunity (EBO) Statement: The 7.8% subcontract goal for this contract was originally calculated and subsequently confirmed by the Goal Set Review Committee.
  5. Sustainability and Resiliency: The Contractor shall be required to comply with the requirements of LEED Silver Certification as noted (No LEED Silver Certificate is required).
  6. Community Engagement: The Contract Administration Department (CAD) will assist the Contractor in all communication efforts to ensure transparency and integration of the stakeholders.
  7. Project: a. Contract delivery method: This is a Design-Build project.

• Hecker Construction Company, Inc.

d. Dollar amount: • Agreement for Design-Build Initial Services covering the pre-construction services was for $242,000, • This GMP Agreement covers the construction cost for the replacement of the Rivercrest Park Boardwalk and other improvements in the amount of $1,090,100 which will bring the Total Cost to $1,332,100.

e. Why the awardee was selected: Most qualified firm was selected pursuant to FS 287.055 Consultants’ Competitive Negotiation Act (CCNA).

• The Initial Services Agreement provided for the design, development of construction documents, and pre-construction services necessary to develop a Guaranteed Maximum Price (GMP) for the replacement of the Rivercrest Park Boardwalk and other improvements.

• This GMP agreement covers the construction cost for the replacement of the Rivercrest Park Boardwalk and other improvements in accordance with the construction documents and all associated work required for a complete project in accordance with the contract.

b. Placemaking: N/A c. Time, Quality Assurance, Cost Monitoring (Budget) • 193 consecutive calendar days to Substantial Completion.

• A full-time City of Tampa Construction Inspector will be on-site during the project to ensure quality of construction.

• The Trimble Unity Construct (Trimble) project management software system will be utilized to optimize the monitoring of schedules and costs. Trimble is a premier system for construction project management.

11 File No. NCA26-24822

(Part 2 of 2)(See Item ) Resolution making certain changes in the budget of the City of Tampa for the fiscal year ending September 30, 2026; approving the transfer, reallocation and/or appropriation of $275,000 from the Demolition of Old Structures project to the Rivercrest Park Boardwalk Renovation project within the CIT Program 5 Capital Projects Fund, CIT Program 6 Capital Projects Fund, and the Utilities Services Tax Capital Projects Fund.

Item details

Financial impact

This financial resolution realigns $275,000 from the Demolition of Old Structures project to the Rivercrest Park Boardwalk Renovation project within the CIT Program 5 Capital Projects Fund, CIT Program 6 Capital Projects Fund, and the Utilities Services Tax Capital Projects Fund.

Reallocated
$275,000
Funding sources
  • $75,000CIT Program 5 FY17 - FY21 Capital ProjectsParks Capital Project ManagementImprov Other Than BldgsDemolition of Old Structures30210.225800.563001.1001617Expenditure Decrease
  • $100,000CIT Program 6 FY22 - FY26 Capital ProjectsParks Capital Project ManagementInfrastructureDemolition of Old Structures30211.225800.563000.1001617Expenditure Decrease
  • $100,000Utilities Services Tax Capital Projects - Pay GoParks Capital Project ManagementInfrastructureDemolition of Old Structures31400.225800.563000.1001617Expenditure Decrease
  • $75,000CIT Program 5 FY17 - FY21 Capital ProjectsParks Capital Project ManagementInfrastructureRivercrest Pk Boardwalk Renov30210.225800.563000.1001936Expenditure Increase
  • $100,000CIT Program 6 FY22 - FY26 Capital ProjectsParks Capital Project ManagementInfrastructureRivercrest Pk Boardwalk Renov30211.225800.563000.1001936Expenditure Increase
  • $100,000Utilities Services Tax Capital Projects - Pay GoParks Capital Project ManagementInfrastructureRivercrest Pk Boardwalk Renov31400.225800.563000.1001936Expenditure Increase

Background

This financial resolution realigns $275,000 from the Demolition of Old Structures project to the Rivercrest Park Boardwalk Renovation project within the CIT Program 5 Capital Projects Fund, CIT Program 6 Capital Projects Fund, and the Utilities Services Tax Capital Projects Fund.

To move forward with the Guaranteed Maximum Price (GMP) for the project, additional funding is required to fully cover project costs. A portion of the GMP includes demolition of existing shoreline structures, and sufficient funding is available within the Demolition of Old Structures project to supplement these specific line-item expenses. The proposed transfer, together with the $847,000 in currently available funding within the CIT Series 2020 Bonds Capital Projects Fund, will provide a total of $1,122,000, which is sufficient to cover $1,090,100 GMP and provide funding for any additional contingencies. The proposed transfer will allow the project to proceed as planned without reducing project scope.

12 File No. NCA26-26470

Resolution approving an Agreement between the City of Tampa, Florida and Los Angeles Organizing Committee for the Olympic and Paralympic Games 2028 (LA28) to participate in the Torch Relay at no cost to the City.

Item details

Background

The Los Angeles Organizing Committee for the Olympic and Paralympic Games 2028 ("LA28"); desires to include the City of Tampa (City) in the Torch Relay; and the City desires to participate in the Torch Relay at no cost to the City; and City Council does hereby affirm that it would be beneficial to the residents of the City to enter into this Agreement between the City and LA28,

Infrastructure Committee

14 File No. INF26-26399

Resolution of the City Council of the City of Tampa, Florida, approving a Route 1 Funding Agreement in the amount of $1,350,000 with the Hillsborough Transit Authority for Increased Bus Service Frequency on Route 1.

Item details

Financial impact

This resolution provides funding for an agreement between the City of Tampa and Hillsborough Transit Authority for increased frequency of Bus Services on Route 1 from the University of South Florida to the City’s downtown area in the amount of not to exceed $1,350,000. Funding is available within the General Fund, Non Department.

Spending authorized
$1,350,000
Funding sources
  • $1,350,000General FundNon Departmental Non ProfitHART Contribution01100.221600.582568Expenditure

Background

HART was created in October of 1979 to plan, finance, acquire, construct, operate and maintain mass transit facilities and supply transportation assistance in Hillsborough County and the City; and HART operates and maintains bus services, including local fixed route buses and express buses; and the City Council of the City as part of its Fiscal Year 2026 budget, approved $1,350,000 for funding increased frequency service on Route 1 for one year with service beginning on January 4, 2026; and HART has increased its provision of weekday and weekend scheduled bus service on Route 1, which travels from the University of South Florida to the City’s downtown area; and it is in the best interests of the City to enter into the Route 1 Funding Agreement.

Supporting documents

15 File No. INF26-26472

Resolution making certain changes in the budget of the City of Tampa for the fiscal year ending September 30, 2026; approving the transfer, reallocation, and/or appropriation of $337,252 for reclaim water pumps for use by the Water Department within the Water Operations Fund.

Item details

Financial impact

This resolution reallocates funds in the amount of $337,252 from budget reserves for reclaim water pumps for use by the Water Department within the Water Operations Fund.

Reallocated
$337,252
Funding sources
  • $337,252Water - OperationsWater Department Engineering ConstructionCapital Outlay Budget Reserve40400.244810.569999Expenditure Decrease
  • $337,252Water - OperationsWater Department Reclaimed WaterMachinery and Equipment40400.244900.564000Expenditure Increase

Background

The Water Department needs to replace reclaim water pumps and valves within the reclaim service area. This resolution reallocates funds in the amount of $337,252 from budget reserves for reclaim water pumps for use by the Water Department within the Water Operations Fund.

Finance Committee

16 File No. F26-26414

Resolution authorizing revision to the Application for Federal Assistance, SF-424 Form associated with the U.S. Department of Energy for Funding from the Energy Efficiency and Conservation Block Grant (EECBG) Program, Award No. DE-SE-0000417.

Item details

Financial impact

This resolution approves the recognition of expenditures within the Utilities Services Tax Fund for use by Facilities Management in order to update the SF-424 Form from the original grant application to match the amount of applicant funds spent on the project (above the grant funding) in the amount of $134,877.94.

Spending authorized (FY26)
$134,878
Funding sources
  • $134,877.94Utilities Services Tax Capital Projects - Pay GoFacilities Building/Facility Management Capital Project CostsInfrastructureBartholomew North HVAC ReplacementFY26 · 31400.210700.563000Expenditure

Background

The grant agreement is to contract for the purchase and installation of new energy-efficient HVAC system(s) in a city-owned Community Center in a disadvantaged community. Updates to the Application for Federal Assistance, SF-424 Form, were requested by the U.S.

Department of Energy to reflect applicant expenses paid toward the project. While there was no required match in the original application or agreement, the City of Tampa stated it would cover any costs exceeding the $413,280 grant award. During the closeout process, the U.S.

Department of Energy requested that we update the SF-424 Form to reflect the total amount of applicant costs. This update will ensure that tangible asset forms, submitted during the closeout process, align with the total project costs, including grant and applicant funds. City of Tampa facilities funding supported $134,877.94 of the total project cost of $548,157.94. This revision updates the SF-424 form accordingly.

17 File No. F26-26466

Resolution making certain changes in the budget of the City of Tampa for the fiscal year ending September 30, 2026; approving the transfer, reallocation, and/or appropriation of $10,500 within the General Fund for the Purchasing Department.

Item details

Financial impact

This resolution realigns $10,500 for the Purchasing Department within the General Fund from Personnel Expenses to Operating Expenses to purchase non-capital computer equipment and software licenses.

Spending authorized
$10,500
Spending reduced
$10,500
Funding sources
  • $10,500General FundPurchasing Administration & BuyersRegular Salaries and Wages01100.235450.512000Expenditure Decrease
  • $10,500General FundPurchasing Administration & BuyersComputers - Bulk Purchases Hardware/Software01100.235450.552007Expenditure

Background

This resolution realigns $10,500 for the Purchasing Department within the General Fund from Personnel Expenses to Operating Expenses to purchase non-capital computer equipment and software licenses.

18 File No. F26-26526

Resolution approving the Assignment of Legal Services Agreements with the City of Tampa as amended by Manson, Bolves, Donaldson & Tanner, P.A. to Bolves Law Group, P.A., in the eminent domain and miscellaneous litigation practice areas as a result of a restructuring of the firm; authorizing the Mayor to execute a consent to said assignment; providing an effective date of January 1, 2026, nunc pro tunc.

Item details

Background

The City of Tampa previously entered into agreements with the law firm Manson, Bolves, Donaldson & Tanner, P.A. to provide outside legal services in eminent domain and miscellaneous litigation matters. Recently, the firm underwent a restructuring and now operates as Bolves Law Group, P.A.

Because the existing legal services agreements require the City’s formal consent before any assignment, Bolves Law Group has requested approval to assume all rights and responsibilities under those agreements as the successor entity. The attached Assignment of Legal Services Agreements documents the transfer of obligations from the former firm to Bolves Law Group, effective January 1, 2026.

19 File No. F26-26572

Resolution approving additional expenditures in the estimated amount of $150,000 for Fiscal Year 2026 under the current Agreement between the City of Tampa and Quintarios, Prieto, Wood & Boyer, P.A.. for the provision of worker’s compensation defense legal services; and approving a new Agreement between the City of Tampa and Quintarios, Prieto, Wood, & Boyer, P.A.. for the provision of worker’s compensation defense legal services for the term beginning October 1, 2026 through September 30, 2028, in an amount not to exceed $300,000.00 per fiscal year; authorizing execution of the Agreement thereof by the Mayor of the City of Tampa.

Item details

Financial impact

This resolution provides funding for an agreement with Quintarios for $300,000 for Risk Management in the Insurance Fund.

Funding sources
  • $150,000InsuranceHuman Resources - Risk Management Worker's CompensationOther-Professional ServicesFY26 · 01200.239300.531002FY2026
  • $150,000InsuranceHuman Resources - Risk Management Worker's CompensationOther-Professional ServicesFY27 · 01200.239300.531002FY2027

Background

Pursuant to Resolution 2024-958 adopted on October 17, 2024, the City entered into an Agreement for the Provision of Legal Services (“Current Agreement”) with Quintarios (“Firm”) in the area of worker’s compensation defense for a term of two years. The City needs to expend additional funds for Fiscal Year 2026 under the Current Agreement in the estimated amount of $150,000, and it is in the City’s best interest to approve such additional expenditures; and The Firm remains uniquely qualified to provide legal services to the City in the area of worker’s compensation defense. It is in the best interest of the City to enter into a new Agreement with the Firm for the provision of legal services for a two-year term beginning on October 1, 2026, through September 30, 2028, in an amount not to exceed $300,000.00 per fiscal year in the form attached to this Resolution.

20 File No. F26-25741

Resolution making certain changes in the budget of the City of Tampa for the fiscal year ending September 30, 2026; approving the transfer, reallocation and/or appropriation of $4,259,093.27 within the Utilities Services Tax Capital Projects Fund for use by the Technology & Innovation Department for capital improvement projects.

Item details

Financial impact

This financial resolution reallocates $4,259,093.27 within the Utilities Services Tax Capital Projects Fund for use by the Technology & Innovation department for capital improvement projects.

Reallocated
$4,259,093
Funding sources
  • $4,277.88Utilities Services Tax Capital Projects - Pay GoTechnology Capital Project CostsImprov Other Than BldgsCitywide Backup Data Center Upgrades31400.242700.563001Expenditure Decrease
  • $378,800.90Utilities Services Tax Capital Projects - Pay GoTechnology Capital Project CostsBulk PurchasesCitywide Backup Data Center Upgrades31400.242700.563005Expenditure Decrease
  • $8,435.49Utilities Services Tax Capital Projects - Pay GoTechnology Capital Project CostsComputers - Hardware/SoftwareCitywide Backup Data Center Upgrades31400.242700.564004Expenditure Decrease
  • $503,579Utilities Services Tax Capital Projects - Pay GoTechnology Capital Project CostsProfessional Services CapitalDimensions Time Keeping and Analytics31400.242700.560005Expenditure Decrease
  • $194,000Utilities Services Tax Capital Projects - Pay GoTechnology Capital Project CostsProfessional Services CapitalTampa Police Data Mart Revamp31400.242700.560005Expenditure Decrease
  • $2,370,000Utilities Services Tax Capital Projects - Pay GoTechnology Capital Project CostsProfessional Services CapitalOracle Recruiting Module31400.242700.560005Expenditure Decrease
  • $800,000Utilities Services Tax Capital Projects - Pay GoTechnology Capital Project CostsProfessional Services CapitalITSM Replacement31400.242700.560005Expenditure Decrease
  • $1,959,093.27Utilities Services Tax Capital Projects - Pay GoTechnology Capital Project CostsCapital Outlay Budget ReservePublic Safety Communications31400.242700.569999Expenditure Increase
  • $2,300,000Utilities Services Tax Capital Projects - Pay GoTechnology Capital Project CostsCapital Outlay Budget ReserveCitywide Infrastructure Upgrade31400.242700.569999Expenditure Increase

Background

This financial resolution reallocates $4,259,093.27 from the Citywide Backup Data Center Upgrades, Dimensions Time Keeping and Analytics, Tampa Police Data Mart Revamp, Oracle Recruiting Module, and ITSM Replacement projects to the Public Safety Communications and Citywide Infrastructure Upgrade projects within the Utilities Services Tax Capital Projects Fund for use by the Technology & Innovation department.

Development and Economic Opportunity Committee

21 File No. DEO26-26467

Resolution making certain changes in the budget of the City of Tampa for the fiscal year ending September 30, 2026; approving the transfer, reallocation and/or appropriation of $1,000,000 within the Community Redevelopment Agency CRA West Tampa Fund for use by the Community Redevelopment Agency for the Commercial Development Grants Program.

Item details

Financial impact

This financial resolution reallocates $1,000,000 within the Community Redevelopment Agency CRA West Tampa Fund for use by the Community Redevelopment Agency for the Commercial Development Grants Program.

Reallocated
$1,000,000
Funding sources
  • $1,000,000Community Redevelopment Agency (CRA) - West TampaCRA Capital ProjectsImprov Other Than BldgsWT Neighborhood Infrastructure62350.213800.563001.1001124Expenditure Decrease
  • $1,000,000Community Redevelopment Agency (CRA) - West TampaCRA Commercial Development GrantOther-Rehab Loans & Grants62350.213832.549008Expenditure Increase

1 account code could not be matched to the City's chart of accounts.

Background

On May 14, 2026, the CRA Board approved the project. The program change to align $1,000,000 from the West Tampa CRA Neighborhood Infrastructure and Improvements Program to the West Tampa CRA Commercial Development Grants Program and the funding agreement is scheduled for the 9/10/26.

22 File No. DEO26-26475

Resolution of the City of Tampa, Florida, approving the non-binding Friendship and Cooperation Agreement and Cooperation Framework Agreement between the City of Tampa, Florida, and the City of Khmelnytskyi, Ukraine, and extending an invitation to the City of Khmelnytskyi, Ukraine, to become a friendship city in the Sister Cities International Program and inviting the people of Khmelnytskyi to participate in said program.

Item details

Background

This is a Resolution approving a non-binding Friendship and Cooperation Agreement and Cooperation Framework Agreement between the City of Tampa and the City of Khmelnytskyi, Ukraine. Approval of this Resolution would establish the City of Khmelnytskyi, Ukraine as a friendship city in the Sister Cities International Program. This is the first Resolution requesting approval of both agreements to establish Khmelnytskyi, Ukraine as a friendship City in the Sister Cities International Program.

23 File No. DEO26-26528

Resolution amending and readopting the Interlocal Agreement between the City of Tampa, the School Board of Hillsborough County, Florida, and the Hillsborough County City-County Planning Commission, for public school educational facility planning, siting and concurrency.

Item details

Background

Agreement to support collaborative planning efforts intended to ensure that adequate public-school facilities are available to serve existing and future students while maintaining consistency with local government comprehensive plans and applicable land development regulations.

24 File No. DEO26-26529

Resolution of the City of Tampa approving an Amendment to the 2025-2027 Local Housing Assistance Plan as required by the State Housing Initiatives Partnership Program Act, Subsections 420.907-420.9079, Florida statutes; and Rule Chapter 67-37, Florida Administrative Code; amending the plan to provide for certain assistance for owners of mobile homes and manufactured housing; approving the execution by the Mayor and attestation by the City Clerk of any necessary documents and certifications needed by the state; authorizing the submission of the Local Housing Assistance Plan for review and approval by the Florida Housing Finance Corporation.

Item details

Background

The State Housing Initiatives Partnership (SHIP) Act, ss. 420.907-420.9079, Florida Statutes (1992), and Rule Chapter 67-37, Florida Administrative Code, requires local governments to develop a three-year Local Housing Assistance Plan outlining how funds will be used. The Plan establishes appropriate strategies for its jurisdiction, including the maximum SHIP funds allowable for each strategy or program. The Housing and Community Development Department prepared a three-year Local Housing Assistance Plan for Fiscal Years 2025-2027 that was submitted and approved by the Florida Housing Finance Corporation in May of 2025, as amended.

SB 594, passed by the Florida Legislature in 2026, lifted the 20% cap for funding assisting Manufactured Housing units built after June of 1994. SB 594 then requires each eligible municipality to adopt a strategy in its active Local Housing Assistance Plan addressing funding and assistance for manufactured housing and mobile home owners.

25 File No. DEO26-26531

Resolution approving the purchase and acceptance of a grant of stormwater easement from Champa Bay Developers, LLC a Florida Limited Liability Company for the installation of stormwater facilities within the properties located at 1510 S. Bay Villa Place, Units 1 and 2 in Tampa, Florida, to be purchased for the amount of twenty five thousand dollars ($25,000.00) together with closing costs of one thousand dollars ($1,000.00) for stormwater purposes.

Item details

Financial impact

That this resolution authorizes the payment of $25,000.00 together with closing costs in the approximate amount of $1,000.00 for an easement located at 1510 S. Bay Villa Place, Units 1 and 2 for use by the Stormwater Department within the Stormwater Improvement Assessment Capital Fund.

Spending authorized (FY26)
$26,000
Funding sources
  • $26,000.00Stormwater Improv Assessment Cap FundStormwater Capital Project CostsProfessional Services CapitalStormwater Consultants and Land Acquisition FY26 · 31700.241800.560005.1002376Expenditure

Background

  1. The City has an existing stormwater pipe at the location but no easement for the pipe. The owner had split the property into two (2) lots and was in the process of development. RED, through negotiation, was able to secure a 12 x 60 easement for stormwater purposes in consideration of $25,000.00.

The Stormwater Services Division requested the Real Estate Department (RED) obtain a stormwater easement from the property owner located at 1510 S. Bay Villa Place, Units 1 and

26 File No. DEO26-26532

Resolution approving a Subdivision Agreement between the City of Tampa, Robles Park, LLC, Robles Park Village Development Group, LLC, and RPV Parcel D, LP, for the Robles Park South Phase 1 Project, providing for the construction and completion of required public infrastructure improvements and applicable performance and defect security.

Item details

Background

The Subdivision Agreement for Robles Park South Phase 1 enables the City of Tampa and the project’s developers to move forward with required public infrastructure construction, including roads, stormwater systems, water and sewer extensions, and related improvements. This agreement enforces the obligations already established in the 2024 Development Agreement and City subdivision regulations.

27 File No. DEO26-26533

Resolution approving the acceptance of a grant of wastewater easement from the University of Tampa, Incorporated, a Florida not-for-profit corporation to the City of Tampa for the installation, construction, repair operation, maintenance and replacement of wastewater facilities in the vicinity of 110 South Boulevard, Tampa, Florida.

Item details

Background

The University of Tampa ("University") is developing the property at 110 S. Boulevard and needs to install a new wastewater pipe for the property development. The City requested the University provide a perpetual wastewater easement for wastewater purposes.

Mobility and Asset Management Committee

28 File No. MAM26-26469

Resolution making certain changes in the budget of the City of Tampa for the fiscal year ending September 30, 2026; approving the transfer, reallocation, and/or appropriation of $500,000 within the Stormwater Service Assessment Fund for motor pool expenses.

Item details

Financial impact

This resolution appropriates and reallocates $500,000 within the Stormwater Service Assessment Fund for use by the Mobility Department for motor pool expenses.

Reallocated (FY26)
$500,000
Grant or revenue accepted (FY26)
$100,000
Funding sources
  • $100,000Stormwater Service Assessment FundTSS - Stormwater OperationsUnassigned Use of Fund BalanceFY26 · 10700.234300.369936Revenue Increase
  • $400,000Stormwater Service Assessment FundTSS - Stormwater OperationsRegular Salaries and WagesFY26 · 10700.234300.512000Expenditure Decrease
  • $500,000Stormwater Service Assessment FundTSS - Stormwater OperationsMotor Pool RentalFY26 · 10700.234300.540001Expenditure Increase

Background

This resolution appropriates and reallocates $500,000 within the Stormwater Service Assessment Fund for use by the Mobility Department for motor pool expenses.

29 File No. MAM26-26525

Resolution making certain changes in the budget of the City of Tampa for the fiscal year ending September 30, 2026; approving the transfer, reallocation, and/or appropriation of $168,605 from the Utilities Services Tax Fund to the Fleet Maintenance Capital Fund for General Government Vehicle Purchases.

Item details

Financial impact

This resolution appropriates $168,605 within the Utilities Services Tax Fund and transfers $168,605 for general government vehicle purchases within the Fleet Maintenance Capital Fund.

Funding sources
  • $168,605Utilities Services TaxNon Departmental AdminSale of City Property10100.220900.364400Revenue Increase
  • $168,605Utilities Services TaxNon Departmental AdminTransfer To Fleet Maintenance Capital Fund10100.220900.591502Expenditure Increase
  • $168,605Fleet Maintenance-CapitalFleet Maintenance AdministrationTransfer From Utilities Services Tax Fund50200.217400.381101Revenue Increase
  • $168,605Fleet Maintenance-CapitalFleet Maintenance AdministrationTransp Equip50200.217400.564001Expenditure Increase

Background

The Utilities Services Tax Fund received proceeds for the sale of general government vehicles.

This resolution appropriates $168,605 within the Utilities Services Tax Fund and transfers $168,605 for General Government Vehicle purchases within the Fleet Maintenance Capital Fund.

10:30 A.M. - Petitions to Vacate and Public Hearings on Legislative Matters

30 File No. BF26-25533

Public hearing on the proposed designation of a brownfield area for rehabilitation pursuant to Chapter 376, Florida Statues, upon an application from Robles Park, LLC, and Open Space Acquisitions, LLC, for property consisting of three adjoining parcels generally located in the vicinity of 3601 North Central Avenue, 3814 North Central Avenue, and 501 East Lake Avenue, consisting of approximately 30.5 acres in the City of Tampa, Florida. (Second public hearing scheduled for September 24, 2026 at 5:01 p.m.) Resolution of the City of Tampa designating a brownfield area within the City of Tampa, Florida, upon application from Robles Park, LLC, and Open Space Acquisitions, LLC for property consisting of three adjoining parcels generally located in the vicinity of 3601 North Central Avenue, 3814 North Central Avenue, and 501 East Lake Avenue, consisting of approximately 30.5 acres for the purpose of environmental rehabilitation and economic development.

Item details

Background

A resolution of the City of Tampa, Florida, calling for public hearings on the proposed designation of a brownfield area for rehabilitation pursuant to Chapter 376, Florida Statues, upon an application from Robles Park, LLC, and Open Space Acquisitions, LLC, for property consisting of three adjoining parcels generally located in the vicinity of 3601 North Central Avenue, 3814 North Central Avenue, and 501 East Lake Avenue, consisting of approximately 30.5 acres in the City of Tampa, Florida, providing for notice; Providing an effective date.

Robles Park, LLC, and Open Space Acquisitions, LLC, have agreed to remediate any on-site contamination and redevelop the site into a transformative, vibrant mixed-use, mixed-income development with affordable and market-rate housing, commercial uses, and community amenities.

Ordinances Presented for First Reading Consideration

31 File No. HN26-26534

An Ordinance of the City of Tampa, Florida, approving the naming of the Activity Center at Williams Park located as 4362 East Osborne Avenue in Tampa, Florida, to honor Frank A. Reddick: Providing an effective date date.

Item details

Background

On May 7, 2026, City Council approved a motion requesting a staff report on the honorary naming of the Activity Center building at Williams Park located at 4362 East Osborne Avenue in Tampa, Florida to honor Frank A. Reddick.

Staff Reports and Unfinished Business

32 File No. Administration Update

Administration Update.

33 File No. F26-26054

Resolution of the City Council of the City of Tampa, Florida, approving an Affiliation Agreement between the City of Tampa and the University of South Florida Board of Trustees for Student Internship Placement.

Item details

Financial impact

This resolution approves an Affiliation Agreement between the University of South Florida Board of Trustees and the City of Tampa in the amount of $1,525 in FY26 and $7,625 in FY27, subject to annual appropriation, for use by the Mobility Department within the Local Option Gas Tax Fund and $1,525 in FY26 and $7,625 in FY27, subject to annual appropriation, for use by the Water Department within the Water Operations Fund.

Plus $15,250 in future-year amounts subject to annual Council approval.

Funding sources
  • $7,625Local Option Gas TaxTSS - Transportation DivisionTemp Personnel-Contractual ServicesFY27 · 10200.243100.534008subject to annual appropriationsubject to annual appropriation
  • $7,625Water - OperationsWater Department EngineeringOther-Professional ServicesFY27 · 40400.244800.531002subject to annual appropriationsubject to annual appropriation

Background

Whereas, the University of South Florida Board of Trustees (“USF”) wishes to provide training experience for students enrolled in USF’s Master of Urban and Regional Planning program; and the City of Tampa (“City”) desires to assist USF by providing opportunities for students to undertake work within the City’s Mobility department and Water department; and the City deems it advantageous to provide non-exclusive notice of internship opportunities for USF students when it has a need for intern services and invites students to express their interest in being considered for such opportunities; and it is in the best interest of the City to enter into this Affiliation Agreement and necessary to set forth the respective terms thereof; and the City and USF agree that they have all right, power, and authority to enter into this Affiliation Agreement.

34 File No. INF26-26401

(Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution approving a Design-Build Services Agreement with a Guaranteed Maximum Price (GMP-2) for Contract 24-C-09001-GMP02 FY24 Citywide Distribution Watermain Improvements Design-Build between the City of Tampa and Kimmins Contracting Corp., in the amount of $9,825,392.59; authorizing the Mayor to execute said agreement on behalf of the City of Tampa; providing an effective date. Please see the previous memorandum dated August 17, 2026 from Richard Mutterback, Director of Contract Administration Department.

Item details

Financial impact

This Resolution authorizes an agreement between the City of Tampa and Kimmins Contracting Corp. for design-build initial services in connection with the Citywide Distribution Watermain Improvements Design-Build Project in the amount of $9,825,392.59 for use by the Water Department within the Water Renewal and Replacement Fund.

Spending authorized
$9,825,393
Funding sources
  • $9,825,392.59Water - Renewal & ReplacementWater Capital Costs DistributionImprov Other Than BldgsCitywide WM Replacements - Ph 240700.244600.563001.1001206Expenditure

Background

  1. Contract Title: 24-C-09001; FY 24 Citywide Distribution Watermain Improvements Design-Build a. Dollar amount: $9,825,392.59 b. Why the awardee was selected: Selected Pursuant to FS 287.055 CCNA.
  2. Contractor/Firm: Kimmins Contracting Corp.
  3. Business Case: Project scope includes coordination and scheduling during the permitting and design phase, cost estimating, construction engineering and inspection (CEI), public relations, administering subcontracts and all related work required for a completed project.
  4. Sustainability and Resiliency: Project provides for construction and public relations for various non-contiguous distribution water infrastructure improvements throughout the City’s water service area.
  5. Community Engagement: The CAD Construction, Engineering and Inspection (CAD-CEI) team will assist the Contractor in the communication efforts to ensure transparency and integration of the stakeholders.
  6. Project: a. Contract delivery method: This is a Design-Build project. A full-time City of Tampa Construction Inspector will be on-site during the project to ensure quality of construction.

Services will be provided under a task order contract for a guaranteed negotiated maximum price (GMP).

GMP 1 provided for construction of approximately, 2,760 linear feet of various sized water mains to be replaced/upgraded to be relocated along South Howard Avenue. Work also included arborist services, maintenance of traffic (MOT), site preparation, installation of water mains, roadway reconstruction, and landscape/irrigation restoration.

GMP 2 provides for construction of various sized water mains and service lines within the Wellswood East Neighborhood. The project area is bordered by Hillsborough Avenue to the north, N Boulevard to the east, N Armenia Avenue to the west and W. Dr. Martin Luther King Jr Blvd to the south.. Work includes replacing pipelines with diameters of 12-in or less as well as fire hydrants assemblies, meter sets, service laterals, valves and various fittings required for a complete and functioning system.

4.Equal Business Opportunity (EBO) Statement: The 17.4% subcontract goal for this contract was originally calculated and subsequently confirmed by the Goal Set Review Committee.

b. Placemaking: N/A c. Time, Quality Assurance, Cost Monitoring (Budget) • 309 consecutive calendar days.

• The e-Builder project management software system will be utilized to optimize the monitoring of schedules and costs. This software was recently purchased by the City of Tampa and is a premier system for construction project management.

35 File No. F26-26422

(Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution approving the renewal of Agreements between the City of Tampa and Austin Construction Group, Inc., Caladesi Construction and Development, Inc., Commercial Interiors, Inc. dba CII Contracting, George G. Solar & Co., Inc., and Gibraltar Construction Co., Inc. in the estimated amount of $1,000,000 per agreement and Envision-CS, Inc., FHP Tectonics Corp. and Johnson-Laux Construction, LLC in the estimated amount of $2,000,000 per agreement for the estimated total amount of $11,000,000, for the provision of Job Order Contracting for Multi-Services for use by various departments.

Item details

Financial impact

This Resolution renews the Agreements between the City and Austin Construction Group, Inc., Caladesi Construction and Development, Inc., Commercial Interiors, Inc. dba CII Contracting, George G. Solar & Co., Inc. and Gibraltar Construction Co., Inc., in the estimated amount of $1,000,000 for each Agreement and Envision-CS, Inc., FHP Tectonics Corp. and Johnson-Laux Construction, LLC in the estimated amount of $2,000,000 for each Agreement for the provision of Job Order Contracting for Multi-Services, for an estimated total amount of $11,000,000 over a 12-month term, subject to annual appropriation, and shall be controlled by requisition.

  • $11,000,000 FY2027 (Estimated Expenditure) controlled by
  • requisition subject to annual appropriation

Background

It is recommended that the City renew its existing agreements with Austin Construction Group, Inc., Caladesi Construction & Development, Inc., Commercial Interiors, Inc. dba CII Contracting, Envision-CS, Inc., FHP Tectonics Corp., George G. Solar & Co., Inc., Gibraltar Construction Co., Inc., and Johnson-Laux construction, LLC for the provision of Job Order Contracting for Multi-Services for use by various departments for additional one-year terms. The existing agreements were made in August 2024. The agreements are in their first renewal terms.

Each agreement was extended by 60 days per section 5.2.1 Supplemental Unilateral Renewal Periods.

Austin Construction Group, Inc., Caladesi Construction & Development, Inc., Commercial Interiors, Inc. dba CII Contracting, Envision-CS, Inc., FHP Tectonics Corp., George G. Solar & Co., Inc., Gibraltar Construction Co., Inc., and Johnson-Laux construction, LLC provide satisfactory services, quality of product and performance. The Logistics and Asset Management Department/ Facilities Management Division has reviewed the prices and feels that it is in the best interest of the city to renew the agreements for additional one-year terms.

Austin Construction Group, Inc., Caladesi Construction & Development, Inc., Commercial Interiors, Inc. dba CII Contracting, Envision-CS, Inc., FHP Tectonics Corp., George G. Solar & Co., Inc., Gibraltar Construction Co., Inc., and Johnson-Laux Construction, LLC have agreed to renew.

Equal Business Opportunity Statement: Pursuant to the review by the Equal Business Opportunity (EBO) Division, this one-year renewal contract is in compliance.

36 File No. INF26-26421

(Part 1 of 4)(See Items 37, 38, & 39)(Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution approving a Design-Build Services Agreement with a Guaranteed Maximum Price (GMP-1) for Contract 23-C-00021-GMP01 South Howard Flood Relief Project Design-Build between the City of Tampa and Kimmins Contracting Corp., in the amount of $92,712,980.91.

Item details

Financial impact

This Resolution authorizes an agreement between the City of Tampa and Kimmins Contracting Corp. for design-build services in connection with the South Howard Flood Relief Project Design-Build in the amount of $92,712,980.91 for use by the Mobility Department within the Stormwater Improvement Assessment Fund, Stormwater Bond Series 2018 Fund, Stormwater Bond Series 2021 Fund, Stormwater Bond Series 2023 Fund, Stormwater Improvement Future Debt Fund, Stormwater Grants Fund, and the CIT Series 2016 Bonds Capital Project Fund.

Spending authorized (FY26)
$92,712,981
Funding sources
  • $12,203,633Stormwater Improv Assessment Cap FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31700.241800.563000.1002448Expenditure
  • $31,291Stormwater Bonds, Series 2018 Capital Projects FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31800.241800.563000.1002448Expenditure
  • $6,348,248.51Stormwater Bonds, Series 2021 Capital Projects FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31801.241800.563000.1002448Expenditure
  • $23,803,114Stormwater Bond Series 2023Stormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31802.241800.563000.1002448Expenditure
  • $25,906,845Stormwater Improvement Future Debt FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31803.241800.563000.1002448Expenditure
  • $21,061,435Stormwater Grants FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 30900.241800.563000.1002448Expenditure
  • $186,518.40Stormwater Grants FundStormwater Capital Project CostsProfessional Services CapitalSouth Howard Flood Relief and StreetscapeFY26 · 30900.241800.560005.1002448Expenditure
  • $3,171,896CIT Series 2016 Bonds Capital Projects FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 30250.241800.563000.1002448Expenditure

1 account code could not be matched to the City's chart of accounts.

Background

  1. Business Case: Project provides for the design and construction of approximately 7,000 linear feet of stormwater conveyance, 11,800 linear feet of various sized water mains to be replaced/upgraded, and 3,200 linear feet of gravity sewer to be relocated along South Howard Avenue within the watershed to alleviate flooding.
  2. Sustainability and Resiliency: Project will include the development of practical green-solutions to improve stormwater quality and provide sustainable concepts that can be incorporated into the project both as part of the proposed stormwater infrastructure, within the project area that align with the goals of the City’s “Green Tampa” Initiatives and the individual focus areas that are part of that program. This shall include Best Management Practices (BMP) and two alternate options for green infrastructure to be used, where appropriate, throughout the project. Wetland and surface water seasonal highwater levels will be identified along the project corridors.
  3. Community Engagement: Project will include an Initiation/Listening phase that will occur when the project is presented to the Stakeholders. Stakeholder interactions will present the project context with goals and benefits and provide opportunities to listen to and document stakeholders’ input regarding their ideas, concerns, and priorities. This phase will also provide stakeholders with direct responses and contribute to the development of an FAQ document, with the assistance of other project team members, addressing the more common questions and/or concerns.
  4. Project: a. Contract delivery method: This is a Design-Build project. A full-time City of Tampa Construction Inspector will be on-site during the project to ensure quality of construction.

1.Contract Title: 23-C-00021 South Howard Flood Relief Project a.Address of Project: S. Howard Avene from Bayshore Boulevard north to W. Swann Avenue b. Number of bidders/submitters: N/A c. Names of bidders/submitters: N/A d.Dollar amount: $92,712,980.91 e.Why the awardee was selected: Selected pursuant to FS 287.055 Consultants’ Competitive Negotiation Act (CCNA).

2.Contractor/Firm: Kimmins Contracting Corp.

Project scope generally includes data collection, public outreach, engineering design, permitting assistance, and negotiation of a guaranteed maximum price (GMP) for construction of a new major stormwater trunk line that runs the length of the project corridor. The project includes full replacement of the improvements within the rights-of-way of S. Howard Avenue and replacement of impacted surface improvements in all the other rights-of-way along the main corridor.

This Guaranteed Maximum Price 1 (GMP 1) provides for the construction of a new stormwater box culvert starting at Bayshore Boulevard up Howard Avenue to Swann Avenue and then proceeding west until reaching Audubon Avenue and then proceeding north for 500 feet. In addition to new underground utilities along with new streetscape and roadway.

4.Equal Business Opportunity (EBO) Statement: The 24% subcontract goal for this contract was originally calculated and subsequently confirmed by the Goal Set Review Committee. g.The 24% subcontract goal for this contract was originally calculated and subsequently confirmed by the Goal Set Review Committee.

b. Placemaking: The size of the stormwater system is designed to meet a minimum level of service (LOS). The minimum required LOS by the City is LOS A (no street flooding) for a 5yr/8hr storm event. This project is intended to reduce flood levels for greater events which will be modeled to the 100-year storm events to achieve LOS C (no structural flooding).

c. Time, Quality Assurance, Cost Monitoring (Budget) • 1,454 consecutive calendar days.

• The e-Builder project management software system will be utilized to optimize the monitoring of schedules and costs. This software was recently purchased by the City of Tampa and is a premier system for construction project management.

37 File No. INF26-26416

(Part 2 of 4)(See Items 36, 38, & 39) (Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution of the City Council of the City of Tampa, Florida, approving an interlocal agreement in the amount of $11,000,000 with Tampa-Hillsborough Expressway Authority for the South Selmon Capacity Project as it relates to City of Tampa’s South Howard Flood Relief Project.

Item details

Financial impact

The resolution approves an interlocal agreement in the amount of $11,000,000 from the Tampa-Hillsborough Expressway Authority to provide for the South Selmon Capacity Project as it relates to the South Howard Flood Relief Project. Funding will be used by the Mobility Department within the Stormwater Grants Fund.

Grant or revenue accepted (FY26)
$11,000,000
Funding sources
  • $11,000,000Stormwater Grants FundStormwater Capital Project CostsLocal Government Unit Grant - General GovernmentSouth Howard Flood Relief and StreetscapeFY26 · 30900.241800.337100.1002448Revenue

Background

The City of Tampa owns and operates certain stormwater drainage improvements within the City limits and is planning its South Howard Flood Relief Project which includes the construction of stormwater infrastructure improvements to relieve area flooding and improve the quality of stormwater discharge. The City requires additional funding to complete the South Howard Flood Relief Project and the Tampa-Hillsborough Expressway Authority will contribute $11,000,000 towards the City’s South Howard Flood Relief Project in exchange for drainage capacity improvements from the City.

38 File No. INF26-26418

(Part 3 of 4)(See Items 36, 37, & 39) (Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution making certain changes in the budget of the City of Tampa for the fiscal year ending September 30, 2026; approving the transfer, reallocation, and/or appropriation of $50,323,966 within the Stormwater Improvement Assessment Fund, Stormwater Bond Series 2018 Fund, Stormwater Bond Series 2021 Fund, Stormwater Bond Series 2023 Fund, Stormwater Improvement Future Debt Fund, Stormwater Grants Fund, Stormwater Capital Projects Fund, and the CIT Series 2016 Bonds Capital Fund for the South Howard Flood Relief and Streetscape Project; providing and effective date.

Item details

Financial impact

This resolution appropriates and reallocates $50,323,966 for the South Howard Flood Relief and Streetscape project. These funds will be for use by the Stormwater Department within the Stormwater Improvement Assessment Fund, Stormwater Bond Series 2018 Fund, Stormwater Bond Series 2021 Fund, Stormwater Bond Series 2023 Fund, Stormwater Grants Fund, Stormwater Improvement Future Debt Fund, and the CIT Series 2016 Bonds Capital Project Fund.

Reallocated (FY26)
$50,829,982
Grant or revenue accepted (FY26)
$40,110,273
Funding sources
  • $506,016Stormwater Improv Assessment Cap FundStormwater Capital Project CostsInter-Fund Group Transfers in Non-OperatingFY26 · 31700.241800.381000.0000000Revenue Increase
  • $3,803,633Stormwater Improv Assessment Cap FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31700.241800.563000.1002448Expenditure Increase
  • $9,073Stormwater Improv Assessment Cap FundStormwater Capital Project CostsInfrastructureLower Peninsula WatershedFY26 · 31700.241800.563000.1000750Expenditure Decrease
  • $8,560Stormwater Improv Assessment Cap FundStormwater Capital Project CostsProfessional Services CapitalRogers Park Drainage ImprovementsFY26 · 31700.241800.560005.1001170Expenditure Decrease
  • $1,069,294Stormwater Improv Assessment Cap FundStormwater Capital Project CostsInfrastructure56th St Flooding ReliefFY26 · 31700.241800.563000.1001420Expenditure Decrease
  • $875,006Stormwater Improv Assessment Cap FundStormwater Capital Project CostsLandKrental Flooding ReliefFY26 · 31700.241800.561000.1001440Expenditure Decrease
  • $190,078Stormwater Improv Assessment Cap FundStormwater Capital Project CostsInfrastructureEverina Street Flooding ReliefFY26 · 31700.241800.563000.1001586Expenditure Decrease
  • $98,451Stormwater Improv Assessment Cap FundStormwater Capital Project CostsProfessional Services CapitalGroundwater DiversionsFY26 · 31700.241800.560005.1001588Expenditure Decrease
  • $81,608Stormwater Improv Assessment Cap FundStormwater Capital Project CostsInfrastructureLake Roberta UpgradeFY26 · 31700.241800.563000.1001589Expenditure Decrease
  • $673,994Stormwater Improv Assessment Cap FundStormwater Capital Project CostsInfrastructure4801 Neptune Way StormwaterFY26 · 31700.241800.563000.1001949Expenditure Decrease
  • $291,553Stormwater Improv Assessment Cap FundStormwater Capital Project CostsInfrastructureClark and 30th Street PipeFY26 · 31700.241800.563000.1002113Expenditure Decrease
  • $31,291Stormwater Bonds, Series 2018 Capital Projects FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31800.241800.563000.1002448Expenditure Increase
  • $31,291Stormwater Bonds, Series 2018 Capital Projects FundStormwater Capital Project CostsInfrastructureVirginia Ave Pumping StationFY26 · 31800.241800.563000.1001597Expenditure Decrease
  • $1,808,176Stormwater Bonds, Series 2021 Capital Projects FundStormwater Capital Project CostsUnassigned Use of Fund BalanceFY26 · 31801.241800.369936.0000000Revenue Increase
  • $5,908,778Stormwater Bonds, Series 2021 Capital Projects FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31801.241800.563000.1002448Expenditure Increase
  • $4,100,602Stormwater Bonds, Series 2021 Capital Projects FundStormwater Capital Project CostsInfrastructureLower Peninsula WatershedFY26 · 31801.241800.563000.1000750Expenditure Decrease
  • $501,523Stormwater Bond Series 2023Stormwater Capital Project CostsUnassigned Use of Fund BalanceFY26 · 31802.241800.369936.0000000Revenue Increase
  • $501,523Stormwater Bond Series 2023Stormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31802.241800.563000.1002448Expenditure Increase
  • $506,016Stormwater Capital ProjectsStormwater Capital Project CostsUnassigned Use of Fund BalanceFY26 · 31000.241800.369936.0000000Revenue Increase
  • $506,016Stormwater Capital ProjectsStormwater Capital Project CostsIntragovernmental TransfersFY26 · 31000.241800.591000.0000000Expenditure Increase
  • $25,906,845Stormwater Improvement Future Debt FundStormwater Capital Project CostsBond ProceedsFY26 · 31803.241800.384001.0000000Revenue Increase
  • $25,906,845Stormwater Improvement Future Debt FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 31803.241800.563000.1002448Expenditure Increase
  • $11,000,000Stormwater Grants FundStormwater Capital Project CostsLocal Government Unit Grant - General GovernmentFY26 · 30900.241800.337100.0000000Revenue Increase
  • $11,000,000Stormwater Grants FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 30900.241800.563000.1002448Expenditure Increase
  • $387,713CIT Series 2016 Bonds Capital Projects FundStormwater Capital Project CostsUnassigned Use of Fund BalanceFY26 · 30250.241800.369936.0000000Revenue Increase
  • $3,171,896CIT Series 2016 Bonds Capital Projects FundStormwater Capital Project CostsInfrastructureSouth Howard Flood Relief and StreetscapeFY26 · 30250.241800.563000.1002448Expenditure Increase
  • $1,638,776CIT Series 2016 Bonds Capital Projects FundTransportation Division Capital Project CostsImprov Other Than BldgsBrorein Street BridgeFY26 · 30250.243000.563001.1000248Expenditure Decrease
  • $1,145,407CIT Series 2016 Bonds Capital Projects FundTransportation Division Capital Project CostsImprov Other Than BldgsCass St Bridge ControllerFY26 · 30250.243000.563001.1000446Expenditure Decrease

2 account codes could not be matched to the City's chart of accounts.

Background

This resolution appropriates and reallocates $50,323,966 for the South Howard Flood Relief and Streetscape project. Current project funding will make up the remaining amount of the total GMP contract price of $92,712,980.91. Project funding will be appropriated and reallocated within the Stormwater Improvement Assessment Fund, Stormwater Bond Series 2018 Fund, Stormwater Bond Series 2021 Fund, Stormwater Bond Series 2023 Fund, Stormwater Grants Fund, Stormwater Improvement Future Debt Fund, and the CIT Series 2016 Bonds Capital Project Fund. Funding will be transferred to the Stormwater Improvement Assessment Fund from the Stormwater Capital Projects Fund.

39 File No. INF26-26425

(Part 4 of 4)(See Items 36, 37, & 38) (Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution of the City of Tampa, Florida, regarding the reimbursement of certain costs relating to the acquisition, construction and equipping of various capital Improvements with respect to South Howard Flood Relief and Streetscape Project.

Item details

Financial impact

The Reimbursement Resolution will allow the City to reimburse itself an amount not to exceed $26,000,000 from future tax-exempt debt proceeds for the South Howard Flood Relief and Streetscape Project.

  • Authorize an amount not to exceed $26,000,000 of debt proceeds to
  • reimburse the City for the South Howard Flood Relief and Streetscape Project.

Background

Staff is requesting Council approve the Reimbursement Resolution allowing the City to reimburse various costs and expenditures related to the construction of the South Howard Flood Relief and Streetscape Project.

Adoption of the reimbursement resolution preserves the City’s ability to issue tax-exempt debt. Without adoption of the reimbursement resolution, any debt issued for this project would be issued as taxable debt at a higher interest rate.

The City has paid for, and/or reasonably anticipates that it will pay for, such costs and expenditures from legally available funds within the Stormwater Improvement Future Debt Fund. It is reasonably expected that any reimbursement of such costs and expenditures shall come from the issuance of tax-exempt debt which is currently not expected to exceed $26,000,000 aggregate principal amount.

It is currently the intention of the City to issue tax-exempt debt from stormwater improvement assessment proceeds and/or a covenant of the City to budget and appropriate sufficient legally available non-ad valorem revenues of the City.

The City aims to avoid issuing debt, but that remains contingent on the City being awarded an increase to the current grant agreement.

40 File No. INF26-26427

(Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution approving the renewal of an Agreement between the City of Tampa and Waste Management Inc. of Florida, with a 4.7% Consumer Price Index for All Urban Consumers (CPI-U) price escalation, for the provision of Processing and Marketing Recyclable Materials (Re-Bid) in the estimated amount of $3,160,000 for use by the Department of Solid Waste and Environmental Program Management.

Item details

Financial impact

This Resolution renews the Agreement between the City and Waste Management Inc. of Florida for the provision of Processing and Marketing Recyclable Materials (Re-Bid) and provides an estimated amount of $3,160,000, over a 12-month term, subject to annual appropriation, for use by the Department of Solid Waste & Environmental Program Management within the Solid Waste Operations Fund.

Plus $3,160,000 in future-year amounts subject to annual Council approval.

Funding sources
  • $2,900,000Solid Waste - OperationsSolid Waste Recycling ProgramOther-Contractual ServicesFY27 · 41400.240800.534007Estimated Expendituresubject to annual appropriation
  • $260,000Solid Waste - OperationsSolid Waste Recycling ProgramOther-Contractual ServicesFY28 · 41400.240800.534007Estimated Expendituresubject to annual appropriation

Background

It is recommended that the City renew its existing Agreement with Waste Management Inc. of Florida for the provision of Processing and Marketing Recyclable Materials (Re-Bid) for use by the Solid Waste Department for an additional one-year term. The existing award was made July 2022. This award is in its third renewal term.

Waste Management Inc. of Florida provides excellent service, quality of product and performance. The Solid Waste Department has reviewed the prices and feels that it is in the best interest of the City to renew the award for an additional one-year period. Waste Management Inc. of Florida has agreed to renew Processing and Marketing Recyclable Materials (Re-Bid) with a 4.7% Consumer Price Index for All Urban Consumers (CPI-U) price escalation, which is allowed per the bid.

EQUAL BUSINESS OPPORTUNITY STATEMENT: Small Local Business Enterprise (SLBE) participation goals were not prescribed in the solicitation because the scope did not meet required EBO parameters; however, it did not preclude participation.

41 File No. INF26-26499

(Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution approving a Design-Build Services Agreement with a Guaranteed Maximum Price (GMP-1) for Contract 24-C-09004-GMP01 FY24 Citywide Distribution Watermain Improvements Design-Build between the City of Tampa and Dallas 1 Corporation, in the amount of $10,467,686.23; authorizing the Mayor to execute said Agreement on behalf of the City of Tampa; proving an effective date.

Item details

Financial impact

This Resolution authorizes an agreement between the City of Tampa and Dallas 1 Corporation for design-build initial services in connection with the Citywide Water Main Replacement Project in the amount of $10,467,686.23 for use by the Water Department within the Water Future Debt Capital Projects Fund.

Spending authorized
$10,467,686
Funding sources
  • $10,467,686.23Water Future Debt Capital Projects FundWater Capital Costs DistributionImprov Other Than BldgsCitywide WM Replacements - Ph 240554.244600.563001.1001206Expenditure

Background

  1. Contract Title: 24-C-09004-GMP01; FY 24 Citywide Distribution Watermain Improvements Design-Build a. Dollar amount: $10,467,686.23 b. Why the awardee was selected: Selected Pursuant to FS 287.055 CCNA.
  2. Contractor/Firm: Dallas1 Corporation
  3. Business Case: Project scope includes coordination and scheduling during the permitting and design phase, cost estimating, construction engineering and inspection (CEI), public relations, administering subcontracts and all related work required for a completed project.
  4. Equal Business Opportunity (EBO) Statement: The 23% subcontract goal for this contract was originally calculated and subsequently confirmed by the Goal Set Review Committee.
  5. Sustainability and Resiliency: Project provides for construction and public relations for various non-contiguous distribution water infrastructure improvements throughout the City’s water service area.
  6. Community Engagement: The CAD Construction, Engineering and Inspection (CAD-CEI) team will assist the Contractor in the communication efforts to ensure transparency and integration of the stakeholders.
  7. Project: a. Contract delivery method: This is a Design-Build project. A full-time City of Tampa Construction Inspector will be on-site during the project to ensure quality of construction.

Services will be provided under a task order contract for a negotiated guaranteed maximum price (GMP).

This Guaranteed Maximum Price (GMP 1) provides for construction of approximately 7 miles of non-continuous between 4" and 8"inch existing watermains within the Hampton Terrace Phase A project area. Work also includes maintenance of traffic (MOT), site preparation, installation of water mains, roadway reconstruction, and landscape/irrigation restoration.

b. Placemaking: N/A c. Time, Quality Assurance, Cost Monitoring (Budget) • 458 consecutive calendar days.

• The e-Builder project management software system will be utilized to optimize the monitoring of schedules and costs. This software was recently purchased by the City of Tampa and is a premier system for construction project management.

42 File No. INF26-26579

(Part 1 of 2)(See Item 43) (Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution approving a Design-Build Services Agreement with a Guaranteed Maximum Price (GMP-1) for Contract 24-C-09002-GMP01 FY24 Citywide Distribution Watermain Improvements Design-Build between the City of Tampa and Ric-Man Construction Florida, Inc., in the amount of $15,970,763.14; authorizing the Mayor to execute said Agreement on behalf of the City of Tampa; proving an effective date.

Item details

Financial impact

This Resolution authorizes an agreement between the City of Tampa and Ric-Man Construction Florida, Inc. for design-build initial services in connection with the Citywide Water Main Replacement Project in the amount of $15,970,763.14 for use by the Water Department within the Water Future Debt Capital Projects Fund.

Spending authorized
$15,970,763
Funding sources
  • $15,970,763.14Water Future Debt Capital Projects FundWater Capital Costs DistributionImprov Other Than BldgsCitywide WM Replacements - Ph 240554.244600.563001.1001206Expenditure

Background

  1. Contract Title: 24-C-09002-GMP01; FY 24 Citywide Distribution Watermain Improvements Design-Build a. Dollar amount: $15,970,763.14 b. Why the awardee was selected: Selected Pursuant to FS 287.055 CCNA.
  2. Contractor/Firm: Ric-Man Construction Florida, Inc.
  3. Business Case: Project scope includes coordination and scheduling during the permitting and design phase, cost estimating, construction engineering and inspection (CEI), public relations, administering subcontracts and all related work required for a completed project.
  4. Equal Business Opportunity (EBO) Statement: EBO Office to provide.
  5. Sustainability and Resiliency: Project provides for construction and public relations for various non-contiguous distribution water infrastructure improvements throughout the City’s water service area.
  6. Community Engagement: The CAD Construction, Engineering and Inspection (CAD-CEI) team will assist the Contractor in the communication efforts to ensure transparency and integration of the stakeholders.
  7. Project: a. Contract delivery method: This is a Design-Build project. A full-time City of Tampa Construction Inspector will be on-site during the project to ensure quality of construction.

Services will be provided under a task order contract for a negotiated guaranteed maximum price (GMP).

This Guaranteed Maximum Price (GMP 1) provides for construction of approximately 9,400 linear feet of non-continuous 2-inch to 8-inch existing watermains within the North Ybor Phase I project area along with approximately 11,200 linear feet of non-continuous 2-inch to 8-inch existing watermains within the Oakford Park Phase I project area. Work also includes maintenance of traffic (MOT), site preparation, installation of water mains, roadway reconstruction, and landscape/irrigation restoration.

b. Placemaking: N/A c. Time, Quality Assurance, Cost Monitoring (Budget) • 365 consecutive calendar days.

• The e-Builder project management software system will be utilized to optimize the monitoring of schedules and costs. This software was recently purchased by the City of Tampa and is a premier system for construction project management.

43 File No. INF26-26585

(Part 2 of 2)(See Item 42) (Placed under Staff Reports and Unfinished Business pursuant to a motion made by Council.) Resolution making certain changes in the budget of the City of Tampa for the fiscal year ending September 30, 2026; approving the transfer, reallocation, and/or appropriation of $15,970,800 for the Citywide Water Main Replacement Project for use by Water Department within the Water Future Debt Capital Projects Fund.

Item details

Financial impact

This resolution reallocates $15,970,800 from the Water Distribution Program Project to the Citywide Water Main Replacement Project for use by the Water Department within the Water Future Debt Capital Projects Fund.

Reallocated
$15,970,800
Funding sources
  • $15,970,800Water Future Debt Capital Projects FundWater Capital Costs DistributionImprov Other Than BldgsWater Distribution Program Project40554.244600.563001.1001939Expenditure Decrease
  • $15,970,800Water Future Debt Capital Projects FundWater Capital Costs DistributionImprov Other Than BldgsCitywide WM Replacements - Ph 240554.244600.563001.1001206Expenditure Increase

Background

The City is awarding a guaranteed maximum price (GMP 1) contract providing for replacement of approximately 9,400 linear feet of non-continuous 2-inch to 8-inch existing water mains within the North Ybor Phase I project area and approximately 11,200 linear feet of non-continuous 2-inch to 8-inch existing water mains within the Oakford Park Phase I project area. Work also includes maintenance of traffic (MOT), site preparation, roadway reconstruction, and landscape/irrigation restoration. This resolution reallocates $15,970,800 from the Water Distribution Program Project to the Citywide Water Main Replacement Project for use by the Water Department within the Water Future Debt Capital Projects Fund.

44 File No. CM26-22164

Planning Commission staff, City Legal Department and City Planning Department to research ways other local governments use to restrict Comprehensive Plan Amendments to the entitlements approved in a Planned Development rezoning and outline the impacts of utilizing similar approaches in the City of Tampa; further, to come back with a written and in-person report.

45 File No. CM26-24829

Mobility Department to present a report detailing the scope of work needed to deliver a citywide alleyways assessment, in addition the proposed scope should include a description of needed tasks, estimated costs, staffing requirements, timelines, and assessment delivery options.

48 File No. CM26-25343

City Council Attorney and the City Attorney’s office to work with any relevant departments, CRA Director, and CRA attorney, to create standard rules and procedures (attendance, quorum, opening and closing timeline applications, etc.) for all committees and boards, and return to City Council with a draft. Memorandum from Dana Crosby Collier, Sr. Assistant City Attorney, and Taylor Bolt, Assistant City Attorney, requesting that said agenda item be continued to October 22, 2026.

Written Staff Reports - (to Be Received and Filed Without Discussion)

50 File No. CM24-5717/CM25-20837

Staff to present monthly reports, quarterly in-person, otherwise written reports on an update on the status of Station 24 to include reports from Fire Chief Barbara Tripp, Director of Contract Administration Richard Mutterback, and the Project Manager, include updates on the date for a groundbreaking. In addition, GMP Contract presentation.

Our stories may be republished online or in print under Creative Commons license CC BY-NC-ND 4.0. We ask that you edit only for style or to shorten, provide proper attribution and link to our website.

Support Tampa Monitor

Reader-funded and independent. Every contribution keeps the reporting going.

Choose an amount

Secure payment via Stripe. Other ways to give →

What we're monitoring

The toolshed

Always-on data tools that keep watch between the stories — built and maintained by the Monitor.

The AgendaA reimagined version of council's weekly agenda.Updated weekly
Capital ProjectsThe city's five-year capital plan & life-to-date spending, every project.FY27 snapshot
Agenda KeywordsEmail notification only if keyword appears on the agenda.Public Beta